The studio is really making progress!  I took a week off early in May and accomplished several big projects.  My goal was to achieve a decent level of climate-control before the summer weather hits in full force; my precious instruments are not built to withstand the south Georgia celsius!  So what all have I accomplished thus far?

  • installed a “new” tin roof to eliminate leaks
  • put down an OSB top floor (the sub floor is old 2″ boards)
  • hung insulation in the ceiling and walls
  • covered the ceiling insulation with black material for aesthetic purposes
  • ran new electrical wiring,  installing several new outlets and light switches in the wall
  • hung drywall
Now my studio is sealed up and the temperature is already under much better control!  My little window-unit AC is actually cooling the whole building now!  Next step: mudding & sanding drywall joints & laying a brick hearth for my wood-burning stove.  SOOOOO much fun!  (I hope to post some pictures soon.  I didn’t start snapping photos at the very beginning of the project, but I will from here on.)

TrackBack Identifier URI

Follow

Get every new post delivered to your Inbox.